page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11 page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
< prev - next > Energy Wind power wind_turbine_pmg_manual (Printable PDF)
• Cut a small flat steel plate 60 x 30 x 6 mm (suggested sizes) and fix it securely
or weld it to the end of the crankshaft as shown in diagram 6.
• Drill 2 holes, 6mm diameter and 40mm apart, centred on the shaft.
6. STEEL PLATE
60
30
• Cut out 3 pieces of 13mm plywood as in diagram 7.
7. COIL-FORMER AND CHEEK PIECES
125 125
20 20
50
20
50
125
The coil former is 50mm by 50mm by 13 thick. It has rounded corners. The two
'cheek pieces' are 125mm by 125mm. There are 20mm wide notches top and bottom
in each. The notches are for putting masking tape under the coil, so that it can be
taped up before removing it from the former.
• Stack the pieces with the notches in line (diagram 8), and drill holes for the
mounting bolts.
The holes are 6mm diameter and 40mm apart.
Use a drill press to drill the holes exactly square to the plywood.
PMG manual
page 11
June 2001